Project: Newcastle Hospital Pedestrian Crossings
Newcastle Hospital Pedestrian Crossings
Client: Healthcare Services Ltd
Contractor: Joyce Construction
Paver Type: Marshall White Marker Concrete Blocks and Weinerburger Clay Blocks - 200mmx100mmx80mm
Area: Key Pedestrian Crossings
Site: Royal Victoria Infirmary Hospital, Newcastle
Resiblock Product: Resiblock Ultra Matt
Date: April 2017

The Site:

Originally built in 1751, the Newcastle Infirmary was renamed The Royal Victoria Infirmary in 1906. The hospitals ‘Royal’ Patronage was awarded by King Edward VII on the 11th July 1906. The fully furnished and equipped hospital, contains twenty wards, a nurses’ home, chapel and five operating theatres, which cost over £300,000,000. The statue of Queen Victoria was gifted by Riley Lord, who was knighted for his efforts in the creation and building of the Infirmary.

The Challenge:

As the key Pedestrian Crossings at the Royal Victoria Infirmary had failed before, stabilisation of the sand joints to prevent paving failure, and the subsequent trip hazards associated with this, was a key part of the consultations. Furthermore, with the use of Marshalls White Marker Concrete Blocks, which have a coated layer of glass beads for reflective qualities, a sealer that would not negatively affect the reflective capabilities of these blocks was required.

The Solution:

As a conventional sealer would be wholly unsuitable for this type of paving, as it would adversely affect the reflective capabilities and therefore negate its purpose as a safety feature, the specialist pre-polymer urethane (SPPU) Resiblock Ultra Matt was selected. Resiblock Ultra Matt’s ability to not only stabilise but also enhance the reflective safety feature of these pavers made this sealer the standout choice for the client Healthcare Services Ltd.

The Benefits:

• One pack material
• Prevents sand erosion from paver joint
• Prevents the ingress of water and fuel spillage to sand laying course
• Maintains structural stability under heavy duty trafficking
• Elastomeric bond works in tandem with paver system

(more Case Studies)

Interpave logo

Institute of Highway Engineers logo

 

Img-suds


Latest Tweets / News


Subscribe to our e-newsletter

Commercial Landscape / Contruction Professionals: Button-small-go

Industry Links


Button-small-twitter

Button-small-rss

Button-small-addthis


 
Logo-sagepay