Project: Solihull Gateway
Solihull Gateway
Client: Solihull Metropolitan Borough Council
Contractor: Balfour Beatty Living Spaces
Paver Type: Tobermore City Space VS5
Area: 500m2
Site: Poplar Rd/Station Rd/High St
Resiblock Product: Resiblock '22'
Date: August 2016

The Site:

Located in the centre of England, Solihull is at the heart of the national rail and motorway network on the southern edge of the West Midlands Conurbation, between Birmingham and Coventry. The town is noted for its historic architecture, which includes surviving examples of timber framed Tudor style houses and shops.

The Challenge:

The paving bedding layer material had not performed as required under loading at the junction of Station Road, Poplar Road and the High Street. This under-performance led to a loss of sand from the joints and destabilisation of the paving and thus needed to be replaced with an alternative higher grade bedding material to prevent the same problem happening again. Balfour Beatty were also looking for a surface solution to prevent sand loss and prevent re-occurring destabilisation while also providing protection to the blocks themselves.

The Solution:

It was decided that the block paving would be lifted, re-laid and Resiblock ‘22’ applied to the new paving to provide stain protection and stabilisation of the sand filled joints. Resiblock ‘22’ utilises a simplistic application, which will prevent water and fuel infiltration via the joint whilst preventing sand erosion and in turn promotes good interlock within the system, preventing paving failures i.e. rutting and deformation from heavy duty trafficking.

The Benefits:

Easy application that requires no specialist labour. Resiblock 22’ binds the jointing sand preventing its removal from both natural and manmade forces. It will inhibit weed and grass growth from the joint whilst providing a significant degree of stain protection. Once cured, it remains fully elastomeric thereby accommodating the small elastic deflections incorporated in the pavement design.

The Benefits at a glance:

• One pack material
• Easy application
• Prevents sand erosion from paver joint
• Prevents the ingress of water and fuel infiltration to the sand laying course
• Maintains structural stability under heavy duty trafficking
• Elastomeric bond works in tandem with paver system

(more Case Studies)

Interpave logo

Institute of Highway Engineers logo

 

Img-suds


Latest Tweets / News


Subscribe to our e-newsletter

Commercial Landscape / Contruction Professionals: Button-small-go

Industry Links


Button-small-twitter

Button-small-rss

Button-small-addthis


 
Logo-sagepay