Button-small-basketButton-small-buy-now
+44 (0)1268 273344
Logo-resiblock-tag Logo-resiblock-anniversary

Case Study

Project: Sainsburys Grantham / Worcester/ Waterlooville
Sainsburys Grantham / Worcester/ Waterlooville
Client: William Southern
Contractor:
Site: 550m2 /270m2 350m2
Resiblock Product: Resiblock 22
Date: December 2014

The Site:

Leading food retailer, Sainsburys care about quality and put “customers at the heart of everything” they do. Which is why they have they have chosen Resiblock ′22′ for the sealing of their three new petrol stations.

The Challenge:

These busy Supermarket Petrol Stations receive heavy traffic on a daily basis. Over time the continuous use of vehicle and pedestrian trafficking contribute to sand erosion from the paver forecourt joints resulting in paver de-stabilisation and fuel infiltration from spills and splashes.

The Solution:

Resiblock ′22′ was developed to stabilise the jointing sand within small element flexibly laid paving at aircraft aprons. Its simplistic application will prevent water and fuel infiltration via the joint whilst preventing sand erosion in turn promoting good interlock within the system, preventing paving failures i.e. rutting and deformation from heavy duty trafficking.

The Benefits:

Resiblock ′22′

(more Case Studies)

Interpave logo

Institute of Highway Engineers logo

 

Img-suds


Latest Tweets / News


Subscribe to our e-newsletter

Commercial Landscape / Contruction Professionals: Button-small-go

Industry Links


Button-small-twitter

Button-small-rss

Button-small-addthis


 
Logo-sagepay